翻訳と辞書
Words near each other
・ Shrewsbury (disambiguation)
・ Shrewsbury (UK Parliament constituency)
・ Shrewsbury Abbey
・ Shrewsbury Abbey railway station
・ Shrewsbury and Atcham
・ Shrewsbury and Atcham (UK Parliament constituency)
・ Shrewsbury and Atcham Borough Council elections
・ Shrewsbury and Birmingham Railway
・ Shrewsbury and Hereford Railway
・ Shrewsbury and Telford Hospital NHS Trust
・ Shrewsbury and Wellington Joint Railway
・ Shrewsbury and Welshpool Railway
・ Shrewsbury Borough School District
・ Shrewsbury Business Park
・ Shrewsbury by-election, 1870
Shree Singaji Thermal Power Project
・ Shree Somnath Sanskrit University
・ Shree Swami ji of Pitambara Peeth
・ Shree Vadleshwar Veer Hanuman Temple - Agwari
・ Shree Venkatesh Films
・ Shree Venkateshwara Hi-Tech Engineering College
・ Shree Vidyalaya
・ Shree Vishnu Mandir
・ Shree Vishnumurthy Temple
・ Shreebalajimandir
・ Shreebhog
・ Shreechaur
・ Shreedeep Rayamajhi (activist)
・ Shreedhar Mahadev Joshi
・ Shreedhar Swami


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Shree Singaji Thermal Power Project : ウィキペディア英語版
Shree Singaji Thermal Power Project

Shree Singaji Thermal Power Project is a coal-fired power plant located near Dongaliya village of Khandwa District in Madhya Pradesh state of India. This project is owned by MPPGCL (Madhya Pradesh Power Generating company limited). The water required is taken from Indira Sagar Reservoir on Narmada River. Coal linkage is achieved with South Eastern Coalfields Limited.〔(Shree Singaji Thermal Power Project, Khandwa ). M.P. Power Generating Company, Ltd.〕
== Installed capacity ==
The Project was originally envisaged to be constructed in three development phases, but only two of the three phases have been approved for construction.
The first phase consists of 2 units with a generation capacity of 600 MW each. First unit was commissioned in February 2014 and, , the second unit is expected to complete in October 2014.〔http://www.orissadiary.com/CurrentNews.asp?id=52133〕
The second phase consists of 2 units with generation capacity of 660 MW each. These units would be super critical thermal plants. , construction of phase two had not yet started.〔http://www.mppgenco.nic.in/SSTPP-STAGE-II.pdf〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Shree Singaji Thermal Power Project」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.